Sign In | Join Free | My himfr.com
Home > Light Testing Equipment >

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

KingPo Technology Development Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. from wholesalers
     
    Buy cheap IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. from wholesalers
    • Buy cheap IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. from wholesalers

    IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

    Ask Lasest Price
    Brand Name : KingPo
    Model Number : KP-NL-001
    Certification : ISO17025 Calibration certificate
    Price : To be quoted
    Payment Terms : T/T
    Supply Ability : 100 sets per month
    Delivery Time : 7 working days
    • Product Details
    • Company Profile

    IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.


    IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

    Introduction

    1.1 Purpose

    This machine is mainly used for torque test after retention test. The test time is one minute and the torque value can be realized according to the standard configuration of different weights.

    1.2 Standard

    IEC61215-2-MQT14.2

    1.3 Technical parameter

    NoItemSpec
    1Working position1
    2Wire diameter0-60mm
    3Torque range0.1Nm,0.15Nm,0.35Nm,0.6Nm ,0.8 Nm,0.9 Nm 1.0 Nm,1.2Nm
    4External dimenstion430×180×250(W×D×H)
    5Weight50Kg

    Installation

    2.1 Disassembling inspection

    1. Check whether the instrument has been damaged or broken in transit;

    2. Check whether the equipment is inverted;

    3. Check whether the specifications on the nameplate are consistent with the order’s;

    4. Check that the packing list is consistent with the object.

    Do not use this instrument if any of the above occurs, and contact us in time.

    2.2 Installation requirements

    1. This instrument should be placed on a horizontal and stable worktable. If it is uneven, it should be adjusted first.

    2. Operation ambient temperature :25 + 10℃, relative humidity: 50±30%RH


    Operation

    3.1 Structure

    1. Substrate: provide support for parts above.

    2. Sample fixture: for holding sample.

    3. Rotary clamping head: used for holding the end of the plug.

    4. Weight lifting wheel: radius 50mm (i.e. torque lever).

    5. Weight: see 1.3 in detail.

    3.2 Procedure

    Please follow the following steps:

    1. Select the suitable sample to insert the end of the power cord into the rotary clip, rotate the clamp and tighten.

    2. Put the sample end into the sample holder and hold it firmly after tightening.

    3. Hang required weights on the hanging wheel line, twist it for 1 ~ 2 laps.

    4. After the load is maintained to the standard time, take off the sample.

    5. Finish operation.


    Maintenance

    4.1 Daily maintenance

    1.Cleaning: the surface of the instrument often needs to be cleaned and cleaned by anti-rust oil and dry cloth to prevent the dead or corroded parts of the unit.

    2. Cleaning: make daily check list and check the device regularly to keep it clean.


    Calibration:


    Quality IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: KingPo Technology Development Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)